RDT Canopy

Clarke Chapman Facilities Management Ltd commissioned DG8 to undertake the redesign of the RDT Chute Wagon canopy, comprising of:

    • A new canopy installation above the existing floor mounted equipment.
    • The tools that were installed in the original canopy tool boxes were moved to a new tool box assembly that was mounted in a cradle on the underframe.
    • The existing batteries and battery isolator were remounted into a modified battery box.
    • A modification was applied to the main engine exhaust guard assembly.